For VOF and Eulerian multiphase calculations, ANSYS Fluent allows you to use variable time stepping in order to automatically change the time step when an interface is moving through dense cells or if the interface velocity is high.
Variable time stepping is available for both the explicit and the implicit volume fraction formulations when using the VOF model. For the Eulerian multiphase model it is only available when using the Multi-Fluid VOF option or when using the explicit volume fraction formulation.
The global time step is
changed in the following manner:
(28–2) |
where the ratio is calculated for each cell. ANSYS Fluent takes
the maximum of this ratio to calculate the global time step.
For transient VOF calculations, when Variable is selected from the Time Stepping Method drop-down
list, in the Run Calculation task page and the button is clicked, the Variable
Time Step Settings dialog box will open (Figure 28.30: The Variable Time Step Settings Dialog Box for Implicit Unsteady
Calculations and Variable Time Stepping). With the exception
of the Global Courant Number field, all parameters
are the same as for adaptive time stepping (see Adaptive Time Stepping). The default value for the Global Courant Number is 2.
Figure 28.30: The Variable Time Step Settings Dialog Box for Implicit Unsteady Calculations and Variable Time Stepping

The variable time step is based on the maximum Courant number near the VOF interface. To calculate that Courant number, ANSYS Fluent uses a flux-based definition where, in the region near the fluid interface, ANSYS Fluent divides the volume of each cell by the sum of the outgoing fluxes. The resulting time represents the time it would take for the fluid to empty out of the cell. The smallest such time is used as the characteristic time of transit for a fluid element across a control volume.
Note: When choosing the values for Minimum and Maximum Step Change Factors, it is generally not recommended to allow large variation in time step size due to stability considerations. This is especially true when time step size is ramping up.
Variable time stepping is not ideally suited to second order time formulation because the second order formulation does not take into account the time step size variation. However, by keeping the minimum time step change factor in the range 0.5–0.8 and the maximum time step change factor in the range 1.2–1.5 it can be used without severely affecting the second order time accuracy.